Floor & Tile Installation in NYC
Whether a floor stays flat and quiet years later is decided before anything gets installed. We prep the subfloor — leveling, moisture checks, underlayment — and set tile on a properly prepared substrate with waterproofing where it belongs.
Hardwood, laminate, vinyl plank, and engineered floors. Bathroom walls, kitchen backsplashes, and full floor tile.
What’s included
- Subfloor prep, leveling, and moisture testing
- Hardwood, laminate, vinyl plank, and engineered flooring
- Floor, wall, and backsplash tile
- Waterproofing for wet areas
- Grouting, sealing, and transitions
- Baseboard and trim reinstallation
What to expect
We’ll look at the existing subfloor before quoting, since that’s where surprises live. You’ll get a layout plan for tile so you know where cuts land before we start.
FAQ
Do you remove the old floor?
Yes — demo and disposal are included in the estimate.
How long before I can walk on new tile?
Typically several hours before light use, longer before heavy furniture.
Can you install over an existing floor?
Sometimes. Depends on the material and the height you can give up at the doors.

